      Project Highlights

      • Project Location: D1, NBP Field, Offshore Mumbai, India
      • Client: Oil and Natural Gas Corporation Limited
      • Contract signed: August 2011
      • Contract: Bareboat and Operations & Maintenance
      • Contract Period: Primary period – 7 years, Extension – 6 years annually
      • Conversion & Integration work: Keppel Shipyard
      • A complex turret moored facility involving topside fabrication and life extension works of over 7000 tones
      • commissioned in record time of 20 months
      • Commissioned: April 2013
      • 100% uptime with zero LTI (Lost Time Incidence) for over 5.5 years of operations
      • UWILD: Completed Underwater Inspection in-lieu of Dry Docking

      Safety Accolades

      • Achieved 8 years of safe operations without a LTI in April 2021
      • Awarded with MERIT in International Safety Award 2021 from the British Safety Council in March 2021
      • Achieved ISO/IEC 27001:2013 9001(Information Security Management Systems); Certifications from IRCLASS in July 2020
      • Awarded with MERIT in International Safety Award 2020 from the British Safety Council in March 2020
      • Achieved Innovation in OSH - SHE Awareness Film in Corporate at OSH India Awards in November 2019
      • Achieved British Safety Council Sword of Honor in Process Safety in October 2019
      • Received 'FIVE STARS' rating in FIRST ATETMPT in PROCESS Safety Audit conducted by the British Safety Council in 2019 with an audit score of 97.57%
      • International Safety Award with MERIT grade from British Safety Council in 2019 for demonstrating a strong commitment to good health and safety management during 2018
      • SWORD OF HONOUR the PINNACLE award in Occupational Health Safety and Wellbeing from British Safety Council in 2018
      • 5-STAR RATING from British Safety Council in OCCUPATIONAL HEALTH & SAFETY
      • International safety award with DISTINCTION grade from British Safety Council in 2018
      • International Safety Oil & Gas Sector Award from British Safety Council in 2018
      • Award for Outstanding Bravery to Mooring Master from British Safety Council in 2018
      • Bravery Award – Environmental Hazard to Marine Superintendent from OSH (Occupational Safety & Health) INDIA in 2018
      • Received Gold Memento Innovation Award-2017 in Oil and Gas Category from OSH (Occupational Safety & Health) INDIA in November 2017
      • Received Duty of Care Award-2017 from International SOS Foundation, Germany in June 2017

      Features

      • Dead Weight - 90,819 tones
      • Length - 246.80 m
      • Beam - 42 m
      • Water Depth - 91 m
      • Processing Capacity - 60,000 bpd*
      • Gas Compression - 7 mmscfd
      • Water Injection Capacity - 15,000 bwpd
      • Storage Capacity - 580,000 bbls
      • Accommodation - 70 bed spaces European style
      • Helideck - For S61N
      • Mooring & Risers - Internal Turret, 6 risers & umbilical
      • * Excluding Design Margin

    • ARMADA STERLING II


      Project Highlights

      • Project Location: C7, NBP Field, Offshore Mumbai, India
      • Client: Oil and Natural Gas Corporation Limited
      • Contract signed: February 2013
      • Contract: Bareboat and Operations & Maintenance
      • Contract Period: Primary period – 9 years, Extension – 7 years annually
      • Conversion & Integration work: Keppel Shipyard
      • A complex turret moored facility involving complex gas compression requirements and topside fabrication and life extension works of over 7000 tones commissioned in record time of 23 months
      • Commissioned: February 2015
      • 100% uptime with zero LTI (Lost Time Incidence) for over 3.5 years of operations
      • UWILD: Completed Underwater Inspection in-lieu of Dry Docking

      Safety Accolades

      • Awarded with MERIT in International Safety Award 2021 from the British Safety Council in March 2021
      • Achieved 6 years of safe operations without a LTI in March 2021
      • Achieved ISO/IEC 27001:2013 9001(Information Security Management Systems); Certifications from IRCLASS in July 2020
      • Awarded with DISTINCTION in International Safety Award 2020 from the British Safety Council in March 2020
      • Production Operator won the Bravery Award in Chemicals category at OSH India, South Asia's largest trade show in the Occupational Safety and Health industry in Mumbai, India in November 2019
      • Marine Supervisor won the Bravery Award in Environmental Hazard Category at OSH India, South Asia's largest trade show in the Occupational Safety and Health industry in Mumbai in November 2019
      • Achieved Innovation in OSH - SHE Awareness Film in Corporate at OSH India Awards in November 2019
      • Received 'FIVE STARS' rating in FIRST ATETMPT in PROCESS Safety Audit conducted by the British Safety Council in 2019 with an audit score of 98.11%
      • International Safety Award with MERIT grade from British Safety Council in 2019 for demonstrating a strong commitment to good health and safety management during 2018 SWORD OF HONOUR the PINNACLE award in Occupational Health Safety and Wellbeing from British Safety Council in 2018
      • 5-STAR RATING from British Safety Council in OCCUPATIONAL HEALTH & SAFETY International safety award with MERIT grade from British Safety Council in 2018
      • Bravery Award – Chemical Hazard to Marine AB from OSH (Occupational Safety & Health) INDIA in 2018
      • Received International Safety Award “winner 2017” from British Safety Council in May 2017 for demonstrating a strong commitment to good health and safety management during 2016
      • Received Silver Memento Innovation Award-2017 in Oil and Gas Category from OSH (Occupational Safety & Health) INDIA in November 2017

      Features

      • Dead Weight - 97,305 tones
      • Length - 246.78 m
      • Beam - 42 m
      • Water Depth - 85 m
      • Processing capacity - 26,500 bpd*
      • Gas Compression - 63.5 mmscfd
      • Water Injection Capacity - 15,000 bwpd
      • Storage Capacity - 510,000 bbls
      • Helideck - Sikorsky S-61N
      • Accommodation - 77 pax
      • Mooring & Risers - Internal Turret, 8 risers and umbilical
      • * Excluding Design Margin


    • WORLD'S LARGEST FPSO WITH GAS, OIL & MOLTEN SULPHUR PRODUCTION FACILITY



      KARAPAN ARMADA STERLING III


      Project Highlights

      • Project Location: Madura field, Indonesia
      • Scope: Engineered & Constructed
      • Constructed: Keppel Shipyard
      • Contract signed: December 2014
      • Commissioned: July 2017
      • Flag: Indonesian
      • Vessel type: AFRAMAX Double Hull
      • End Client: HCML (a JV of Husky Oil, Canada and CNOOC, China)
      • Zero LTI (Lost Time Injury) during construction phase

      Safety Accolades

      • An Indonesian company has operated the FPSO with 99% uptime and with zero LTI during the first year of operation after the facility was successfully commissioned by SPOGL Group

      Features

      • Dead Weight - 107, 160 tones
      • Length - 246.78 m
      • Beam - 35 m
      • Water Depth - 55 m
      • Gas Processing capacity - 110 mmscfd
      • Storage Capacity - 750,000 bbls
      • H2S Stripping - 0.45%
      • CO Stripping - 6.4%
      • Helideck - BELL 412
      • Accommodation - 80 pax
      • Mooring & Risers - 12 points spread mooring system, 2 risers


    • WORLD'S LARGEST FPSO WITH GAS, OIL & MOLTEN SULPHUR PRODUCTION FACILITY



      ARMADA STERLING V


      Project Highlights

      • Contract Type: Bareboat Charter and O&M Project
      • Project Location: Eastern Offshore, India
      • Contract signed: 05-Jul-2019
      • Tenure: 9 Years (firm) + 7 Annual Extensions
      • First Oil: 07-Jan-2024
      • Capacity: Liquid Processing : ~60,000 blpd
      • Gas Processing : ~2.96 MMSCMD
      • Water Injection : ~51,000 bwpd
      • Storage Over 80,000 bbls
      • Key Features :
      • India's largest FPSO designed for super-cyclones of eastern offshore, India and with the largest submersible turret system. First to use low NOx power solution in India


    • STERLING STREAMLINE


      Next-generation of standardized FPSO hull design, aimed to streamline the future of offshore production

      Aproval in Principal (AIP) for the Concept and Design Basis for “Sterling Streamline” from American Bureau of Shipping (ABS) received on 26 October 2023

      Project Highlights- Design Principles

      • Client Focused : Early client engagement to better understand requirements
      • Sustainable : GHG emission reduction - CCGT, CCUS
      • Flexible : Plug-and- play topsides configuration
      • Future-Ready : Digital Twin and Artificial Intelligence / Machine Learning (AI/ML) ready
      • Streamlined : Standardized hull with streamlined interfaces for faster delivery
      • Oil processing capacity : up to 250,000 BOPD
      • Storage capacity : up to 2.2 million barrels
      • Topside operating weight :up to 65,000 tonnes
      • 100Design life : 33 years
      • Riser Balcony : support for ~60 risers & umbilicals (expandable

      KEY HIGHLIGHTS FPSO AND O&M BUSINESS

      • Production Till Date : 152 Mn+ boe
      • EPCIC Manhours : ~32.5 Mn
      • LTI & TRI-free Operational Manhours : 9.8 Mn+
      • Professional Strength : ~1400

    Shapoorji Pallonji Energy Pvt. Ltd.
    Forbes Building, 2nd Floor, West Wing,
    Charanjit Rai Marg, Fort,
    Mumbai - 400 001, India.
    Tel : +91-22-6115 5800
    Fax : +91-22-6115 5801
    CIN : U11100MH2012PTC234446

    • Home
    • About Us
    • Floating Solutions
    • Companies
    • Careers
    • News & Events
    • Contact Us
    • Terms & Condition
    • Company Brochure
    • Annual Return
    • Privacy Policy
    Copyright © 2019, Shapoorji Pallonji Energy Pvt. Ltd. All Rights Reserved.
    Corporate Social Responsibility (CSR)